Potash

All dollar values are CDN.

Patience Lake

Operations

Annual operational capability — 0.5 million tonnes KCl
Mining depth — solution mine at 1,000 meters
Products — lawn and garden, and granular-grade potash

Performance

Significant Events

  • Achieved five years without a lost-time injury
  • Able to keep hourly employees working 77 percent of the year despite 37 weeks of shutdowns by redeploying them to capital and maintenance projects
  • Recorded no reportable environmental incidents

Community Relations

  • Addressed community concerns about noise, dust and traffic related to the expansions; held discussions with affected residents

Community Donations

  • Donated $32,000 to local organizations, including Sunset Estates volunteer fire department, Steelworkers Organization of Active Retirees (SOAR), Ducks Unlimited Canada, Reflections of Nature and Junior Lady Diamondbacks

Education Partnerships

  • Initiated education partnerships with Aberdeen School, including assistance with a fundraiser

Awards

  • Recognized by the United Way of Saskatoon and Area (along with PotashCorp Allan and Cory and the head office) for raising more than $2 million over the life of the program
  • Won the overall Surface Provincial Mine Rescue Champion award in 2009 for the fifth consecutive year

Energy and Environment

  • Undertook a green cover program to restore wildlife habitat
  • Increased energy efficiency by recapturing heat from the dust collection system
  • Reduced water usage by using a dry process, instead of a wet process, for dust collection

Local Procurement

  • Made local purchases in 2009 of $9.9 million, or 67 percent of total expenditures (excluding major expansions, raw materials, energy and transportation)
Patience Lake
Source: PotashCorp
  2005 2006 2007 2008 2009
Annual Production (000 tonnes KCl) 251.0 190.1 257.0 282.4 100.5
           
Employment          
# of employees 68 67 70 75 80
Gender ratio (% female/total employees) 5.8 7.5 8.6 8.0 7.6
Average tenure (years) 21.3 20.1 17.9 17.5 16.9
Absenteeism rate (% hours absent) 5.2 3.0 3.9 5.5 3.2
Employee training (hrs per employee) 40 53 112 92 150
           
Safety Performance          
Lost-time frequency (per 200,000 hrs)
Recordable frequency (per 200,000 hrs) 5.0 3.7 3.2 3.5 3.4
           
Greenhouse Gas Emissions          
GHG emissions (000 tonnes) 35.1 33.7 36.7 28.2 32.5
Normalized GHGs (GHGs/tonne production) 0.14 0.18 0.14 0.10 0.33
           
NPRI Air Pollutants (tonnes)          
Nitrogen oxides 36.4 35.1 38.4 30.2 33.4
Carbon monoxide 26.0 25.0 26.9 20.7 23.6
Particulates (dust) 214.1 181.3 202.6 176.2 130.7
Volatile organic compounds 1.8 1.7 1.7 1.3 1.6
           
Mining Waste (000 tonnes)          
Coarse tailings to storage 69.9 18.1 36.7 47.7 9.5
Tailing to mine 124.7 159.8 263.0 257.4 84.7
           
Water Use (000 m3)          
Water withdrawn 761 309 457 425 302
Recycled water 12,574 12,574 12,574 12,352 13,258
           
Environmental Expenditures
($ 000)
         
Operating expenditures 535 290 542 598 1,251
Capital expenditures 1,503 817 3,476 3,865 2,943
           
Energy          
Energy costs ($ million) 8.5 7.6 7.6 7.2 7.0
Energy use (TJ) 844 803 884 720 769
Energy efficiency (GJ/tonne production) 3.4 4.2 3.4 2.6 7.8
           
Procurement          
Local purchasing ($ million) 3.1 3.7 5.9 14.5 9.9